<?xml version="1.0" encoding="UTF-8"?>
<root>
    <author>ENA</author>
    <category>Sectors</category>
    <date>2025-11-07 17:59:36</date>
    <fulldesc>&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;&lt;strong&gt;New Delhi, Nov 7 (KNN)&lt;/strong&gt; Indias accelerated rollout of renewable energy capacity is placing stress on the power grid and contributing to higher electricity supply costs, amid a slower-than-expected rise in demand, a senior Central Electricity Authority (CEA) official said on Friday.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;CEA Chairperson Ghanshyam Prasad, speaking at a forum hosted by The Energy and Resources Institute (TERI), noted that the countrys renewable capacity additions in the first half of 2025 were the fastest since 2022. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;India has already reached a milestone of sourcing half of its installed power capacity from non-fossil fuel sources and aims to add 500 GW of such capacity by 2030.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;However, Prasad cautioned that Indias current approach&amp;mdash;building transmission infrastructure based on expected renewable generation rather than actual capacity utilisation or demand&amp;mdash;has driven a sharp rise in transmission charges, raising concerns among state distribution utilities, according to Reuters.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;With transmission networks being prepared in advance of confirmed demand, grid absorption remains uncertain, he said, resulting in some renewable projects lacking power purchase agreements.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;India is expected to add more than 40 GW of renewable capacity this year, but without demand, the surplus would be very difficult to manage, Prasad observed. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;He warned that developers could face situations where clean-power capacity is built but cannot be evacuated or sold.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;To manage the challenge, the CEA will revise transmission plans every six months to better align with real-time capacity expansion trends and is collaborating with the India Meteorological Department to enhance localised forecasting for wind and solar generation. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;Prasad also called for robust resource adequacy planning at both national and state levels to help distribution companies anticipate requirements and contract capacity accordingly.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;While affirming Indias commitment to renewables, Prasad stressed that maintaining grid reliability would require continued investment in coal, nuclear, hydro and gas-based capacity. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;em&gt;&lt;strong&gt;&lt;span style=&quot;font-size:14px&quot;&gt;(KNN Bureau)&lt;/span&gt;&lt;/strong&gt;&lt;/em&gt;&lt;/p&gt;&#13;
</fulldesc>
    <id>44008</id>
    <link>https://knnindia.co.in/news/newsdetails/sectors/rapid-renewable-growth-strains-power-grid-raises-costs-amid-soft-demand-cea</link>
    <pubDate>2025-11-07 17:59:36</pubDate>
    <source>knnindia.co.in</source>
    <title>Rapid Renewable Growth Strains Power Grid &amp; Raises Costs Amid Soft Demand: CEA</title>
</root>
