<?xml version="1.0" encoding="UTF-8"?>
<root>
    <author>ENA</author>
    <category>Sectors</category>
    <date>2025-12-24 16:51:04</date>
    <fulldesc>&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;&lt;strong&gt;New Delhi, Dec 24 (KNN)&lt;/strong&gt; The Commission for Air Quality Management (CAQM) in NCR and Adjoining Areas has issued Show Cause Notices to six coal-based thermal power plants (TPPs) located within a 300-km radius of Delhi for non-compliance with mandatory biomass co-firing norms. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;The action follows a review of compliance for FY 2024 25 based on data submitted by the Ministry of Power.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;Under the Environment (Utilisation of Crop Residue by Thermal Power Plants) Rules, 2023, coal-based TPPs are required to co-fire a minimum of 5 per cent biomass pellets or briquettes made from crop residue, with a minimum threshold of over 3 per cent prescribed for FY 2024 25 to avoid Environmental Compensation (EC). &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;These provisions aim to promote ex-situ management of paddy straw, curb stubble burning, and reduce air pollution in NCR and adjoining regions. CAQM has been monitoring implementation since 2021 through statutory directions, reviews, and inspections.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;The Commission found that the following plants recorded biomass co-firing levels significantly below the mandated thresholds during FY 2024 25 and has proposed EC accordingly: Talwandi Sabo Power Limited, Punjab (Rs 33.02 crore); Panipat Thermal Power Station, Haryana (Rs 8.98 crore); Deenbandhu Chhotu Ram Thermal Power Station, Haryana (Rs 6.69 crore); Rajiv Gandhi Thermal Power Plant, Haryana (Rs 5.55 crore); Guru Hargobind Thermal Power Plant, Punjab (Rs 4.87 crore); and Harduaganj Thermal Power Station, Uttar Pradesh (Rs 2.74 crore). &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;The total proposed Environmental Compensation across the six plants amounts to approximately Rs 61.85 crore.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;CAQM noted that despite repeated statutory directions, including Direction No. 42 issued in September 2021, and subsequent engagements with stakeholders, compliance gaps persist. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;In early 2024, notices under Section 14 of the CAQM Act, 2021 were issued to several consistently underperforming TPPs, and a committee was constituted to examine representations from non-compliant plants for FY 2024 25.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;The concerned TPPs have been directed to submit written explanations within 15 days of receipt of the notices, failing which further action may be initiated under the CAQM Act, 2021. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;The Commission reiterated that biomass co-firing remains a key intervention for managing crop residue and reducing air pollution, and stated that strict enforcement of statutory directions will continue to ensure sustained compliance.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;&lt;em&gt;&lt;strong&gt;(KNN Bureau)&lt;/strong&gt;&lt;/em&gt;&lt;/span&gt;&lt;br /&gt;&#13;
 &lt;/p&gt;&#13;
</fulldesc>
    <id>44539</id>
    <link>https://knnindia.co.in/news/newsdetails/sectors/six-coal-based-power-plants-face-rs-6185-cr-penalty-for-biomass-norm-lapses</link>
    <pubDate>2025-12-24 16:51:04</pubDate>
    <source>knnindia.co.in</source>
    <title>Six Coal-Based Power Plants Face Rs 61.85 Cr Penalty For Biomass Norm Lapses</title>
</root>
