<?xml version="1.0" encoding="UTF-8"?>
<root>
    <author>ENA</author>
    <category>Sectors</category>
    <date>2026-01-12 16:43:04</date>
    <fulldesc>&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;&lt;strong&gt;New Delhi, Jan 12 (KNN)&lt;/strong&gt; The National Highways Authority of India (NHAI) has created four Guinness World Records for large-scale, continuous bituminous concrete paving on the under-construction Bengaluru Kadapa Vijayawada Economic Corridor (NH-544G), marking a significant milestone in highway construction and execution efficiency.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;The records were achieved by NHAI in association with concessionaire Rajpath Infracon Private Limited and relate to the scale, speed and continuity of bituminous concrete laying under a six-lane national highway project.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;On 6 January 2026, two Guinness World Records were established near Puttaparthi in Andhra Pradesh. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;These included the longest continuous laying of bituminous concrete, covering 28.89 lane km (equivalent to a three-lane-wide stretch of 9.63 km) within 24 hours, and the highest quantity of bituminous concrete laid continuously in 24 hours, amounting to 10,655 metric tonnes. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;According to NHAI, both records were set for the first time globally under a six-lane national highway project.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;Building on this achievement, two additional records were created on 11 January 2026 across Package-2 and Package-3 of the corridor. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;These included the continuous laying of 57,500 metric tonnes of bituminous concrete and continuous paving of 156 lane km (a three-lane-wide stretch of 52 km), surpassing the earlier world record of 84.4 lane km.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;NHAI said the record-setting exercise involved the deployment of extensive construction resources, including 70 tippers, five hot mix plants, one paver and 17 rollers. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;Quality assurance and process monitoring were carried out with support from institutions such as IIT Bombay and original equipment manufacturers, to ensure compliance with prescribed quality and safety standards.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;The 343-km-long, access-controlled Bengaluru Kadapa Vijayawada Economic Corridor is being developed as a six-lane highway designed for high-speed and safe travel. The corridor includes 17 interchanges, 10 wayside amenities, a 5.3-km tunnel, and around 21 km passing through forest areas.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;Once completed, the corridor is expected to reduce the travel distance between Bengaluru and Vijayawada by about 100 km from the existing 635 km to around 535 km and cut travel time from nearly 12 hours to approximately eight hours. &lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;The project is also aimed at improving regional connectivity, particularly between the Rayalaseema region, coastal and northern Andhra Pradesh, and the Koparthy Industrial Node.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;NHAI stated that the Guinness World Records reflect its focus on adopting advanced construction practices and delivering large-scale highway infrastructure in line with national objectives for efficiency, safety and economic development.&lt;/span&gt;&lt;/p&gt;&#13;
&#13;
&lt;p&gt;&lt;span style=&quot;font-size:14px&quot;&gt;&lt;em&gt;&lt;strong&gt;(KNN Bureau)&lt;/strong&gt;&lt;/em&gt;&lt;/span&gt;&lt;br /&gt;&#13;
 &lt;/p&gt;&#13;
</fulldesc>
    <id>44748</id>
    <link>https://knnindia.co.in/news/newsdetails/sectors/nhai-achieves-four-guinness-world-records-on-bengalurukadapavijayawada-economic-corridor</link>
    <pubDate>2026-01-12 16:43:04</pubDate>
    <source>knnindia.co.in</source>
    <title>NHAI Achieves Four Guinness World Records On Bengaluru–Kadapa–Vijayawada Economic Corridor</title>
</root>
